NJW have won a contract variation with Transport for London to carry out surveys of up to 23 sites with acceptance to complete further sites subsequently. NJW previously carried out a full survey of the Ruislip Depot to design a full working survey/CAD/CAFM practice methodology.

Phase 1 includes the following site surveys:

  • Northfields LUL depot
  • Neasden LUL depot
  • Acton Town Works
  • Ealing Common depot
  • Earls Court offices
  • Hammersmith LUL depot

 

Deliverables for each of the sites include:

Site survey recording:

  • Tenancy information (which departments are using which buildings, or parts of buildings)
  • Land detail (size, use)
  • Occupancy data for all buildings – which teams; usage over period
  • Creation of AutoCAD drawings for campus, land, buildings and floors

 

Upload of data to Focal365 analytics platform:

  • Floor plans and all relevant information gathered
  • Handover of findings and relevant recommendations.

NJW have a full Workplace team working onsite with TFL based in London.